Section 184 agreement - vehicle crossings over footways and verges
Section 184 of the Highways Act 1980 provides that a developer will need to enter an agreement for the construction of, or alterations to, any site access or accesses. It relates specifically to accesses where the work being done is all that is required to enable the development, or if the work needs to be done before the main works can proceed under a Section 38 agreement (adoption of highways) or a section 278 Agreement (allowing a developer to carry out works to a public highway).
The Local Highway Authority reviews and approves the agreements, and appropriate fees will be payable to them. A commuted sum may also be required for the Highway Authority to be able to maintain the works once they have been completed, usually for a fixed period between 10 and 25 years.
An agreement is necessary when a developer plans to construct or alter any site access or accesses to a public highway that is of a higher specification than something simple such as a dropped footway or verge crossing.
The scope of a Section 184 Agreement can be extended, in some instances, to cover additional minor works, such as relaying a short length of kerbing on either side of a new access, provision of street lighting for an access, or the re-positioning of a gully.
Section 38 agreement - adoption of highways, clauses can be incorporated into a Section 184 agreement where it is desirable that the highway contain both the land that is being dedicated as public highway by the developer as well as the access works, such as providing visibility splays.
As Section 184 does not provide for the formal entering into of agreements between a developer and Highway Authority, an Agreement should have regard to the following subsections:
- Subsection 3: The owner or occupier of land can be served notice by the Authority for the execution of the works.
- Subsection 7: The Authority can recover from the owner/occupier all expenses that are reasonably incurred from the works.
- Subsection 9: Any person named in a notice may offer to execute the works themselves in accordance with approved plans.
- Subsection 10: If subsection 9 is followed but the developer fails to comply with their offer, then the Authority can execute the works and recover expenses.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.